SCADA-IOT BASED IRRIGATION MODERNISATION UNDER PMKSY
SCADA-IOT BASED IRRIGATION MODERNISATION UNDER PMKSY
Water being a State subject, it is for the State Government concerned to plan, implement and manage the irrigation projects, and to prepare action plan to make irrigation system more extensive in the State. Role of Government of India is limited to providing technical support, and partial financial assistance for identified projects under the ongoing schemes.
Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) was launched during the year 2015-16, with an aim to enhance physical access of water on farm and expand cultivable area under assured irrigation, improve on-farm water use efficiency, introduce sustainable water conservation practices, etc. Extension for implementation of PMKSY during 2021-22 to 2025-26 has been approved by Government of India in December, 2021.
Technological innovations such as underground pipelines, micro-irrigation, SCADA based monitoring etc. are promoted under Pradhan Mantri Krishi Sinchayee Yojana- Accelerated Irrigation Benefits Programme (PMKSY-AIBP). States are encouraged to adopt such interventions for enhanced water use efficiency.
Some of the important projects under PMKSY-AIBP with SCADA as a component are listed at Annexure-I.
Further, the Cabinet has approved to implement pilot projects for Modernization of Command Area Development and Water Management (M-CADWM) as a sub-scheme of PMKSY on 09.04.2025. The scheme aims for efficient distribution and utilisation of water through pressurised piped network and use of micro-irrigation in a designated cluster by adopting the principles of integrated water resources management. The Supervisory Control and Data Acquisition (SCADA) and Internet of Things (IoT) are also envisaged for water accounting and water management under the scheme. A total of 32 nos. of clusters in 23 States/UTs are sanctioned for inclusion under the M-CADWM Scheme. The details of 32 nos. of clusters are at Annexure-II.
Mother Sanctions (Budget allotment) under PMKSY-AIBP are issued to States project wise. Components under a project is undertaken in a financial year on the basis of progress made under the project and their action plan for execution of the project in that financial year. For M-CADWM Scheme, the approved total outlay is Rs. 1600 crores of which Central Share is Rs. 1100 crores (including Rs.100 crores for Administrative and Other Expenses) and State share is Rs. 500 crores. Rs. 550 crores is the budget outlay in BE 2026-27.
The details in respect of M-CADWM Scheme are placed at Annexure-II.
However, M-CADWM Scheme will develop suitable models for different agro-climatic zones, integrating various sources of water, and different levels of water availability, covering both areas of assured irrigation and protected irrigation. These models will pave the way for development of a national plan for modernization of water management in rural area in general and irrigation services in particular based on integrated, sustainable, efficient and inclusive water management.
The information was provided by THE MINISTER OF STATE FOR JAL SHAKTI SHRI RAJ BHUSHAN CHOUDHARY in a written reply to a question in Lok Sabha today.
***
ND
(Lok Sabha USQ 3376)
ANNEXURE-I
Important projects under PMKSY-AIBP with SCADA as a component
Sl. No.
State
Name of the Project
Status of the project
(1)
(2)
(3)
(4)
1.
Karnataka
ERM of Narayanpur Left Bank Canal
Completed
2.
Madhya Pradesh
Indira Sagar Canal Project Phase-V (Khargaon Lift)
Completed
3.
Maharashtra
Lower Wardha Project
Completed
4.
Maharashtra
Bembla River Project
Completed
5.
Maharashtra
Dongargaon Project
Completed
6.
Maharashtra
Bodwad Parisar Sinchan Yojna Stage-I
Ongoing
7.
Maharashtra
Gosikhurd Project
Ongoing
8.
Maharashtra
Lower Pedhi Project
Ongoing
9.
Telangana
J. Chokka Rao Devadula Lift Irrigation Scheme
Ongoing
10.
Jharkhand
Subernrekha Multipurpose Project
Ongoing
ANNEXURE-II
List of Projects/Clusters sanctioned under M-CADWM
SN
State / UT
Cluster Name
District
Cluster
CCA (Ha)
Total Cost
(Rs. In Cr.)
Amount Released to State/UT (5% of CA)
(Rs. in Thousand)
(1)
(2)
(3)
(4)
(5)
(6)
(7)
1
Andhra Pradesh
Peddagedda Project WUA – 3,4,5,6 Clusters
Vizianagaram, Paravathipuram Manayam
3061
60.76
18,228
2
Arunachal Pradesh
Dekam Rikmeng (Ledum Village)
East Siang
978
19.41
8,736
3
Assam
Singua FIS
Kamrup
1200
23.82
10,719
4
Bihar
Mahmadpur
Muzaffarpur
2450
48.6325
14,590
Badal(480)
5
Bihar
Bangra-
Saran
2,195
43.57
13,071
Kishunpur
6
Chhattisgarh
Bagiya
Jashpur
4831
95.90
28,769
7
Goa
Sal, Vadaval, Mencurem
/Advalpal
North Goa
1,563
31.03
9,308
8
Gujarat
Mandvi- Mangrol Taluka Villages
Surat
6,069
120.46
36,139
9
Gujarat
Pinchhavi
Gir Somnath
523
10.38
3,114
10
Haryana
Panihar- Choudhariwas
Hisar
4,950
98.26
29,477
11
Himachal Pradesh
Haroli
Block,District Una
Una
4889
97.05
43,671
12
Karnataka
Distributary 54 9R of Tungabhadra Left Bank Canal
Raichur
2,600
51.61
15,483
13
Karnataka
Hattikuni
Yadgiri
2,145
42.58
12,773
14
Madhya Pradesh
Gudariya
Khandwa
2,320
46.05
13,816
15
Madhya Pradesh
Netangaon
Khandwa
2,387
47.38
14,213
16
Madhya Pradesh
Bahuti PH2
Rewa
3160
62.73
18,818
17
Maharashtra
AsodaBhadali Branch canal of Waghur LBC
Jalgaon
4996
99.17
29,751
18
Manipur
Pengjang
Churachandpur
500
9.93
4,466
19
Meghalaya
Lyngkhoi FIP
East khasi Hills
170
3.37
1,519
20
Mizoram
Champhai Sub- Valley MCAD Cluster, Champhai
Champhai
320
6.35
2,858
21
Nagaland
Mongleu
Jalukie
Peren
200
3.97
1,787
22
Odisha
MCAD Cluster-
V
Nuapada
3,180
63.12
18,937
23
Punjab
SBS Nagar
SBS Nagar
856
16.99
5,097
24
Punjab
Ludhiana, Malerkotla, Fatehgarh
Sahib
Ludhiana, Malerkotla, Fatehgarh Sahib
1500
29.78
8,933
25
Rajasthan
Right Main Canal (RMC) of Bisalpur
Project
Tonk
5,000
99.25
29,775
26
Tamil Nadu
Palladam Extension canal
Tiruppur
4,989
99.03
29,709
27
Tripura
Brahmacherra
Khowai
135
2.68
1,206
28
Uttar Pradesh
Bargadwa
Gorakhpur
149
2.96
887
29
Uttar Pradesh
Malaon&
Majhagavan
Gorakhpur
550
10.92
3,275
30
Uttar Pradesh
Prajapatipur
Sant Kaabir Nagar
284
5.64
1,691
31
Uttar Pradesh
Rajdhani
Gorakhpur
790
15.68
4,704
32
J&K
Patyari
Samba
400
7.94
3,573