Parliament Question: – National Highways in Bihar
Parliament Question: – National Highways in Bihar
Development and maintenance of National Highways (NHs) is a continuous process. The list of NH projects in Bihar approved for implementation are at Annexure-I. The list of ongoing NH projects in Bihar are at Annexure-II. The list of NH projects in Bihar completed during last ten years is at Annexure-III.
The bottlenecks in the ongoing and approved for implementation of NH projects in Bihar including Katihar are mainly due to delay in land acquisition, forest clearance, utility shifting, etc.
21 new toll plazas have been proposed in the State of Bihar. There is no new toll plaza proposed in Katihar district.
User fee rates on NHs throughout the country including Bihar are revised annually in accordance with NH Fee Rules 2008.
The details of toll plaza-wise number of toll tenders which have been extended beyond their original period are at Annexure-IV.
ANNEXURE-I
ANNEXURE-I REFERRED TO IN REPLY TO PART (a) OF LOK SABHA UNSTARRED QUESTION NO. 4022 TO BE ANSWERED ON 19.12.2024, ASKED BY SHRI TARIQ ANWAR REGARDING NATIONAL HIGHWAYS IN BIHAR
List of NH projects in Bihar approved for implementation
Sl. No
Name of Project
NH No.
Length (km)
1
Construction of 4 lane with paved shoulder of Darbhanga (Dilli More) – Banwari Patti from km 0.00 to km 14.95 (Package-1) including Pre-construction activities from km 0.00 to km 53.133 of NH-105(New NH-527B)
527B
14.95
2
Four lane with Paved shoulder configuration from Existing Km 0+000 to Km 39+500 (design km (0+500) to Km 40+342, Design length km) of NH – 227A ( near Mehrauna Ghat (UP – Bihar Border) to Siwan on Hybrid Annuity Model (HAM) basis
227A
40.842
3
Construction of Four-Lane of Chausa-Buxar Bypass from Km 45.000 to Km 65.915 (Package – 2)
319A
20.915
4
Construction to two-laning with paved shoulder of Daudnagar Bypass, Nasriganj Bypass and Dawath Bypass of NH-120
120
5.535
5
Construction of 6 no of Mangobandhar Kendua, Tolesono, Jhajha,Narganjo & Bhairogunj Bypasses including Pre-Construction activities from km 72.000 to 134.000 of NH – 333A
333A
41.271
6
Construction of Four lane with paved shoulder of Bhagalpur– Kharhara village (Dhaka more) from Km- 0+000 to KM 36+600 of NH 133E
133 E
36.6
7
Construction for 2 Lane ROB over L.C. No 2 between Muktapur & Kishanpur Station on Samastipur – Darbhanga Road (NH-322) in Samastipur District
322
1.64
8
Construction of 3 no. of Bypasses at Sheikhpura, Jamui & Khaira including Pre-Construction activities from km 0 to km 72.00 of NH-333A
333A
13.472
9
Construction of additional 3-Lane Bridge over River Ganga for connection between Buxar and Bharauli on NH-922
922
3.30
10
4 lanning of Manikpur to Sahebganj section
139W
44.65
11
6L Patna – Purnia Expressway
—
270
ANNEXURE II
ANNEXURE-II REFERRED TO IN REPLY TO PART (a) OF LOK SABHA UNSTARRED QUESTION NO. 4022 TO BE ANSWERED ON 19.12.2024, ASKED BY SHRI TARIQ ANWAR REGARDING NATIONAL HIGHWAYS IN BIHAR
List of ongoing NH projects in Bihar
Sl . No
Name of Project
Length (km)
Appointed Date
Physical progress
%
Schedule/Revised Date of Completion
1
Construction of 2-lane combined ROB in km 1.10 & km 1.11 of NH- 101.
1.5
28.08.2019
95.3%
31.12.2024
2
Construction of 2-lane ROB of km 94 of NH-28B
1.744
09.03.2022
33.01%
30.06.2025
3
Construction of 2-lane ROB of km 91 of NH-28B
1.258
08.04.2022
87%
16.04.2025
4
Construction of ROB in km 49 of NH 131A at Gaushala
1.21
05.02.2021
69.25%
31.03.2025
5
Construction of ROB in km 194 (LC no. 53B/T-2) of NH 327E
1.58
16.05.2020
60.45%
31.03.2025
6
Construction of ROB in km 24 (LC no. 77A) of NH 327A
1.05
16.05.2020
98.3%
31.12.2024
7
Construction of 2 lane ROB and its approaches in km 158 on NH-104 at Jainagar Bypass in the state of Bihar on EPC mode
ROB
09.11.2022
51.00%
25.06.2025
8
Construction of 4 lane ROB and its approaches at the level of crossing (L C No. 29-B) of Km 29
(Ekangansarai) at NH-110(New NH- 33) & Railway Km 32.63 of Fatwa (FUT) – Islampur (IPR) section in the state of Bihar on EPC mode.
3.66
20.07.2024
2.50%
19.07.2026
9
Construction of a new 4 lane Major Bridge across River Kosi at Phulaut including Rehabilitation and upgradation of existing Birpur-Bihpur Section of NH-106 from km 106 to
136 to 2- Lane Paved shoulder on EPC mode
28.918
07.06.2021
59.70%
15.05.2026
10
Construction of a new 4 lane (Parallel to existing MG Setu) with its
14.5
25.03.2021
48.21%
28.02.2026
14.500 across river Ganga on NH-19 at Patna on EPC basis.
11
Construction of New 4-Lane Bridge (Parallel to existing Vikramashila Setu)from km 8+920 to Km 13+375(including approach road 35m Naugachhia side &53 m Bhagalpur side)across River Ganga on newly declared NH-131B at Bhagalpur in the State of Bihar
4.5
9.05.2023
22.3%
08.05.2027
12
Construction of New high level RCC bridge at existing location of old Bridge cross Chir River in km 199 on NH-333A & its approaches having an aggregate length of 700 (350 m on both side) in District Banka in the state of Bihar on EPC mode
Bridge
15.11.2022
99.99%
31.12.2024
13
Construction of 6-Lane Elevated / Extra Dose Cable Bridge on River Ganga parallel to & Western side of Digha-Sonepur Rail cum-Road Bridge of NH 139W in the State of Bihar.
6.895
02.05.2024
0
02.11.2027
14
Widening & strengthening work from Km 26.3 to 26.75 and km 30.45 to
30.65,km 32.45 and km 32.66 ,33.910
to km34.200 & km 34.200 to km t km
34.4 of NH- 104 on item rate in state (New NH 331) in the state of Bihar for the year 2021-22
1.33
30.06.2022
90.0%
31.01.2025
15
Strengthening work in km 68 to 89 of NH110 under EPC Mode in the State of Bihar.
20.65
16.03.2021
98.0%
31.12.2024
16
Improvement of 2 lane with paved shoulder of stretch from Bikramganj Dawath Melayabagh Nawanagr – Dumrow of NH-120 (Km-201.665 to Km 240.200) excluding Dawath bypass under EPC mode in the state of Bihar
36.965
05.09.2023
60.00%
30.06.2025
17
Rehabilitation & widening work for 2′ Lane with Paved Shouldering of Existing National Highway 80 Alignment from Km.’132.895 to Km ‘190.150 Bhagalpur- Kahalgaon – Mirzachowki section
57.255
04.11.2022
40.0%
30.06.2025
18
Rehabilitation & Widening work for 2-lane/2-Lane with Paved Shoulder of Existing NH-80 from km 70.15 to
50.875
01.02.2023
64.84%
31.03.2025
Km 121.025 of Munger-Suttanganj – Bhagatpur- Mirzachowki section on EPC Mode in the State of Bihar.
19
Improvement to two lane with paved shoulder from Ramnagar to Roseda from (km 3.500 to 43.000) of NH 527 E on EPC mode in State of Bihar.
39.5
12.10.2024
0
11.04.2026
20
Balance work for improvement to 2 lane with paved shoulders configuration in realignment from Km 52.320 to Km 52.940 (length- 0.620 Km) of NH-81, Protection works in HL Bridges at Km 33 & Km 36, Protection work for the approach of Mahananda River bridge and reconstruction of culvert in 30th km of NH-81 on EPC mode
0.62
16.11.2022
70.33%
31.03.2025
21
Improvement to two lane with paved shoulders of BH/WB Border- Amdabad-Manihari section from design Km 0+000 to Km23+945 of NH-131 A on EPC mode
23.945
27.09.2024
0.00%
26.03.2026
22
Improvement to two lane with paved shoulders of NH 122B from km 29.730 to km 72.348 under EPC mode including Pre construction activity of NH 122B from km 0 to 72.348.
42.618
8.05.2023
73.26%
31.03.2025
23
Improvement to two lane with paved shoulders of NH-319A from km 0 to km 45 in state of Bihar under EPC mode
45
20.06.2023
60.00%
31.03.2025
24
Widening to 2/4-lane with paved shoulders of left out portion of NH 30 from existing CH.125.285 to CH
115.485 (Kayamnagar to Zero Mile) in the state of Bihar for the year 2021-22
8.6
21.04.2023
62.0%
31.03.2025
25
Construction of Bhabhua Bypass from Ch. 10+800 to Ch. 19+860 and Chand Bypass from Ch. 38+060 to Ch. 40+460 and widening of existing road to 2 – lane with Paved shoulder from Ch. 40+460 to Ch. 46+860 of NH-219
8.6
09.03.2024
0
08.09.2025
26
Construction of proposed 4_Lane Revelgunj bypass NH-19 in the State of Bihar on EPC mode.
7.155
10.07.2023
35.0%
09.07.2025
27
Improvement to two lane with paved shoulder of Saraigarh ( on NH – 327A ) – Lalganj-Ganpatganj upto NH – 106 (New NH 131) from km
0.000 to km 10.672 of NH 327AD
10.672
15.09.2023
14.00%
15.03.2025
28
Widening from 2-lane to 4- lane of km 92.935(starting point of old NH 82) to 99.685 km (End Point of Gaya Bypass of NH- 33) of NH – 120.
6.75
22.08.2024
0
21.02.2026
29
Geometric improvement of NH- 327E at Bhargama and Sukela More including provision of Raniganj Bypass in the state of Bihar.
5.529
12.06.2024
3%
12.12.2025
30
Construction to 2 lanes with Paved Shoulder of Jandaha Bypass of NH 103(NH-322) in CH 0.000 (existing Km 35 of NH-103) in the state of Bihar.
4.8
15.01.2024
2.6%
15.07.2025
31
Improvement to two lane with paved shoulder of Sarwan – Chakai upto NH-333 from km 0.00 to Km 15.972 of NH 333C
15.972
01.11.2024
20%
30.04.2026
32
Widening & Strengthening to 2-lane with paved shoulder of NH-81 from Km 30.250 to Km 55.400
25.15
30.09.2024
8.5%
29.09.2025
33
Improvement to Two lane with paved shoulder from Junction of NH-22 near Hajipur to Junction of NH-122 at Bachhwara via Mahnar and Mohiuddin Nagar from km 0.00 to 29+730 of NH 122B
29.73
30.08.2024
3%
28.02.2026
34
Rehabilitation and Upgrading to 2 lanes/2-lane with paved shoulders configuration and strengthening of Birpur – Bihpur Section (from km 0.0 to Km 106) of NH – 106 i under phase –I of National Highways Interconnectivity Improvement Projects (NHIIP)
106
03.10.2016
90.10%
31.03.2025
35
Four Laning of Gaya Hisua-Rajgir- Nalanda-Biharsharif Section Km 0.00 to 92.935 on NH-82 in state of Bihar
92.935
07.11.2016
96.45%
31.03.2025
36
Construction of two lane with paved shoulders standard- 4 no. of Bypasses at Katoria, Lakhpura, Banka & Panjwara including Pre- Construction activities from Km
134.000 to Km 190.233 of NH-333A
14.359
09.12.2024
0.00%
08.12.2026
37
4L Greenfield Alignment of Amas to Shivrampur from 0.000 Km. to
55.002 Km. of NH 119 D (Pkg-I)
55.00
31.03.2023
10.88
29.03.2025
38
6L of Aurangabad to Bihar-Jharkhand border (Chordaha) section from km. 209.827 to Km. 249.525 of NH-19 (PKG-02)
39.70
05.04.2022
63.92
31.03.2025
39
4L Elevated Section and at-grade improvements at Begusarai town (Simaria – Khagaria section) from Km. 221.047 to Km. 225.302 of NH- 31
4.26
27.06.2022
63.17
31.03.2025
40
Aunta – Simaria including Ganga Bridge
8.15
30.08.2018
88.77
31.03.2025
41
Maheshkunt-Saharsa-Purnea (Pkg I) km 0.00 to km. 90.00 of NH-107
90.00
20.12-2019
76
31.03.2025
42
Widening with additional 3L abetting Chhapra Bypass Section of NH-19 from Km. 143.200 to Km. 159.255 (Pkg-1)
16.05
30.08.2024
4.42
29.08.2026
43
6L Bridge and its approaches across River Ganga as Part of Patna Ring Road (NH-131G) starting from Km
8.480 near Sherpur to Km 23.000 near Dighwara
14.52
05.09.2023
1.25
05.09.2027
44
Chhapra – Hajipur from km. 143.200 to km. 209.200
66.74
27.01.2011
86.7
30.04.2025
45
Construction of Major Bridge over Baghmati and Lakhandei River along with Approaches from Design km.16.500 to km.21.500
5.00
30.10.2024
0
31.03.2027
46
4L of Greenfield Alignment from Km. 47.000 to Km. 89.210 of
Balbhadarpur to Bela Nawda Section of NH-119D
42.21
11.03.2024
6.6
10.03.2026
47
4L Elevated Highway and at grade improvements at Gopalganj Town from Km. 384.000 to Km. 386.750 on NH-27
2.75
04.03.2022
92.18
31.03.2025
48
2L PS of Majhauli to Charout section from km. 0.00 to km. 63.655
63.66
05.11.2019
96.05
31.03.2025
49
Permanent rectification of 8 Nos. of blackspots on NH-27 & 1 No of at – grade junction removal near Satanpur junction
10.259
19.11.2024
0.00
18.11.2026
50
4L Greenfield starting from NH-30 near Saristabad (Patna) to Nathupur (Project end point of Patna-Gaya- Dobhi Section of NH-83)
3.91
27.02.2024
10.2
07.09.2025
51
4L Greenfield Alignment of Shivrampur to Ramnagar from Km.
55.002 to Km. 109.300 of NH 119 D (Pkg-II)
54.32
04.07.2023
10.3
03.07.2025
52
4L of Balance works of Patna – Gaya
-Dobhi (Pkg-II) from km. 39.00 to km. 83.00 of Old NH-83
44.00
09.11.2020
98.5
31.12.2024
53
4L of Balance works of Patna – Gaya
-Dobhi (Pkg-III) from km. 83.00 to km. 127.217 of Old NH-83
44.22
24.11.2020
98.4
31.12.2024
54
4L of Balance works of Patna – Gaya
-Dobhi (Pkg-I) from km. 0.00 to km.
39.00 of Old NH-83
39.00
14.12.2020
99.9
31.12.2024
55
4L of Siwan- Masrakh section of Ram Janki Marg from Km 230.385 to Km 281.391 of NH-227A
50.12
20.11.2024
0
20.11.2026
56
Construction of 2 flyovers of 4- lanes at Chhatauni Chowk and Awadesh Chowk on NH-28A, Re-construction of 3 no. of gantry girder gates with the statue of Mahatma Gandhi on NH-28 and NH-28A & Construction of Service Road and Drain near Piprakothi on NH27
3.34
11.07.2024
0
11-01-2026
57
Rehabilitation and Upgradation of Chroma – Bairgania Section of National Highway No 227F to 2 lane with paved shoulders from Design Ch.0.000 to Ch. 34.566
34.57
01.02.2024
43.5
31.01.2026
58
Permanent rectification of 3 nos. of black spots in U.P border – Dewapur – Kotwa section & Permanent rectification of 5 nos. of black spots in Kotwa – Mehsi – Muzaffarpur Section of NH – 27
13.60
12.12.2023
0
11.12.2025
59
Balance work – WB-10 (Gandak Bridge) Km 402.00 to Km 440.00 (Devanpur – Kotwa)
2.75
30.07.2022
62.48
31.03.2025
60
4L of Munger – Mirzachauki section from Munger to Kharia village junction from Km 69+520 to Km 95+580 (Pkg-1)
26.06
31.03.2022
35.02
30.06.2025
61
4L of Munger – Mirzachauki section
29.42
12.03.2022
64.23
25.03.2025
from Km 95+580 to Km 125+000 (Pkg-2)
62
4L of Munger – Mirzachauki section from start of existing Bhagalpur bypass to Rasulpur from Km 125+000 to Km 157+350 (Pkg-3)
32.35
06.04.2022
45.05
30.09.2025
63
4L of Munger – Mirzachauki section from Km 157+350 to Km 193+931 (Pkg-4)
36.58
17.08.2022
60.89
31.03.2025
64
Strengthening under one time improvement of 4L of Bakarpur Hat (NH19 Bypass) –Manikpur section of NH-139W
38.81
08.10.2024
0
05.04.2027
65
4L Elevated Corridor from Danapur to Bihta
25.08
11.03.2024
13.64
08.09.2026
66
4L Greenfield Alignment from Kalyanapur to Tal Dashraha of NH- 119D (Pkg-III)
47.00
16.02.2023
13.85
31.12.2025
67
Bakhtiyarpur-Rajauli Pkg-III from km. 101.630 to km.152.520
50.89
31.12.2021
98.23
15.02.2025
68
Bakhtiyarpur (Km 153.300) to Mokama (Km 197.900)
44.60
14.06.2017
96
31.03.2025
69
Maheshkunt -Saharsa-Purnea Pkg II
87.96
13.12.2018
76.88
31.03.2025
70
Ara – Mohania (Pkg-II)
60.80
16.01.2021
98.45
31.03.2025
71
Six Laning of Varanasi to Aurangabad from km. 786.00 to km.
978.40 of Old NH-2
192.40
12.09.2011
86.14
31.03.2025
72
Umagaon-Saharsa (Package-V) Bakaur-Parsarma-Bangaon-Bariyahi & Spur to Mahishi
39.18
15.12.2023
46.89
14.12.2025
73
Umagaon-Saharsa (Package-IV) Koshi Bridge & approach Road – (Bheja-Bakaur)
13.30
12.02.2020
68.2
30.06.2025
ANNEXURE III
ANNEXURE-III REFERRED TO IN REPLY TO PART (a) OF LOK SABHA UNSTARRED QUESTION NO. 4022 TO BE ANSWERED ON 19.12.2024, ASKED BY SHRI TARIQ ANWAR REGARDING NATIONAL HIGHWAYS IN BIHAR
List of NH projects in Bihar completed during last ten years
SI.
No.
Name of Project
Length (in km)
Expenditure ( Rs. in crore)
Date of Completion
1
Widening & Strengthening of existing single lane to double lane carriageway in Km 68.10 to Km 86.25 of NH-110
18
58.71
28.04.2017
2
Strengthening & widening to 2 lane with paved shoulder from Km 39 to Km 56 of NH-327E
17
44.13
23.03.2017
3
Strengthening & widening to 2 lane with paved shoulder from Km 98 to Km 112 of NH-327E.
14
63.83
25.03.2017
4
Strengthening & widening to 2 lane with paved shoulder from Km 68 to km 75 NH-327E
7
33.42
15.03.2017
5
Strengthening & widening to 2 lane with paved shoulder from Km 154 to Km 166 of NH-327E
12
57.0
05.04.2017
6
Widening and strengthening of existing road into 2 lane from km 14.50 to km 30 of NH-101 (Job No-101-BR-2012-839)
15.5
30.06
31.03.2018
7
Widening to 2-lane and improvement from km 0.00 to km 14.60 of Malaypur- Barhat-Lalmatia-Khadigram Road (MDR) in under LWE
14.6
20.87
25.03.2014
8
Widening and strengthening of existing road into 2 lane with paved shoulder in km 0.00 (Dobhi) to 11.400 (Gosaidih) of NH-99
11.4
40.28
31.05.2018
9
Widening & Strengthening of existing single lane to double lane Carriage way from km. 0.00 to km 28 of NH-105 under Special Project Scheme
28
86.53
30.05.2018
10
Balance work Construction of 5 x 24.00 High Level R.C.C. Bridge across Noon River in replacement of old narrow and damaged screw pile bridge in Km 45th of NH 103 (Hajipur – Musarigharari Section) for the year 2006 – 07
MJB
18.68
30.06.2018
11
Strengthening & Widening work of existing 2-lane to two lane with paved
4.5
4.5
30.06.2018
shoulder including service road & divided carriageway in Araria from km 93.612 to
98.00 of NH-327E.
12
Widening and strengthening existing single/ intermediate lane to 2-lane from km. 30.25 to km 55.40 of NH 81 under special project for 2011-12.
25
139.61
30.06.2018
13
Upgradation of existing carriageway to 2 lanes/2 lane with paved shoulders configuration of Anishabad-Aurangabad- Hariharganj Section (km 0.0 – km 154.625) of NH-98 -Lot-II
89
365.58
25.09.2018
14
Strengthening & Widening of existing carriageway to 2 lane with paved shoulders from Km 40 to km 64 of NH- 28B
24
93.84
30.06.2018
15
Widening & Strengthening of existing single lane to double lane Carriage way from km. 28 to 53.76 of NH-105 under Special Project Scheme
25.76
164.48
15.10.2018
16
Construction of Bhagalpur bypass from Km 124/175 to 140/200 of NH-80 under EPC mode
16.7
301.91
11.06.2019
17
Strengthening & Widening of existing carriageway to two lane with paved shoulder from km 0 to 39 of NH 327E
39
108.06
25.03.2019
18
Upgradation to 2 lanes/2 lane with paved shoulders of Anishabad-Aurangabad- Hariharganj Section (km 0.0 – km 154.625) of NH-98 – Lot-I
62
355.36
24.10.2019
19
Strengthening & Widening to 2 lane with paved shoulder from km 0.00 to 40.00 on EPC mode on NH 2C
40
231.3
28.12.2019
20
Strengthening & Widening of existing carriageway to two lane with paved shoulder from km 56 to km 68 of NH 327E
12
40.71
31.05.2019
21
Strengthening & Widening of existing carriageway to two lane with paved shoulder from km 75 to 93.612 of NH 327E
18.612
72.62
05.12.2019
22
Improvement of stretch & junction at km
0.00 to 1.40 of NH-80 for the year 2016-
17 under job no. NH-080-BR-2016-17- RSCE-032.
1.4
18.5
29.12.2018
23
Widening & strengthening to 2-lane with paved shoulder from km 62 to 75 of NH- 333
13
68.5
20.06.2019
24
Widening & strengthening to 2 lane with paved shoulder & Geometric Improvements in Bettiah -Kushinagar section from km 25 to 40 of NH-28B
15
76.3
20.02.2019
25
Balance work of widening to 2-lane and Improvement of Biharsharif (Telhara) – Jehanabad- Arwal (Kendui) Km 36.00 to
68.10 of NH-110
32.1
82.97
31.07.2019
26
Strengthening from 136 to 166 including replacement of 1 Minor Bridge in km 143 of NH-80
31
37.85
31.03.2021
27
Strengthening and widening to 2 lane with paved shoulder from km 112.00 to
136.440 (Gitawas-Raniganj JVC Canal) of NH-327E
24.385
100.44
07.01.2021
28
Strengthening work from km 0.00 to km
36.50 (Mehrauna UP Border to Siwan) of NH-227A on EPC
36.5
37.25
30.01.2021
29
HL RCC Minor Bridge (2x21m) in km 24 of NH-333 job no.
Bridge
4.43
27.06.2020
30
Construction of High level New RCC Bridge (5x11eff) in replacement of existing old narrow and damaged bridge no. 135/1 in km 135 of NH-327E
Bridge
5.95
15.07.2020
31
Strengthening and Raising of NH-19 (Chapra-Manjhi section) from km 129 to 135 & from km 139 to 143.
9.218
14.67
26.10.2020
32
Strengthening & Widening work of existing 2-lane to two lane with paved shoulder from 0.00 to 25.010 of NH- 327A
25.01
76.74
31.05.2020
33
Strengthening & Widening work of existing 2-lane to two lane with paved shoulder and geometric improvement from km 64.00 to 97.00 of NH-28B
29.6
243.1
24.06.2021
34
Strengthening work in Km 53.00 to 89.00 of NH-33(old NH-110) on EPC mode
35.609
28.85
03.05.2021
35
Widening & Strengthening of existing Single lane to Double lane carriageway in Km 0 to 40 of NH-104 in Bihar under EPC mode
40
186.84
29.02.2020
36
Strengthening from 194.01 to 227.11 of NH-327E
33.1
34.69
24.06.2020
37
Balance work of widening & strengthening from km 167 to km 180 of NH- 80 for the year 2016-17
13
21.37
31.05.2018
38
Widening to 2 lane with paved shoulder
19.04
90.32
02.11.2021
in km 0.00 to 19.04 of NH-81 on EPC Mode
39
Construction of 4-lane ROB of km 119 of NH-30 (L.C No 48-A/3T)
1.56
96.49
25.05.2021
40
Rehabilitation and upgrading to 2 lanes/ 2 lane with paved shoulders configuration of Fathua-Harnaut-Barh section (km 0.00 to km 69.00) of NH-30A in Bihar – One time Improvement of left out portion of Harnaut Bypass of NH-30A
3.12
2.1
27.09.2021
41
Strengthening work in Km 35.00 to 64(P) of NH-333A on EPC mode
29.25
24.4
16.06.2021
42
Strengthening work of NH 227A (Part) from Chakia (NH-28) to Lalachhapra chowk via Kesariya from km 118.040 to km 142.756 on EPC mode.
24.716
27.24
14.12.2021
43
Strengthening work in Km 35.00 to 64(P) of NH-333A on EPC mode
29.25
24.4
16.06.2021
44
Strengthening including improvement of geometrics work from km 104.20 to km 110 of NH-28B (New NH-727) on EPC
mode
5.8
16.6
31.03.2021
45
Construction of 4-lane ROB (L.C No SK/257C) of km 11 of NH-327E
ROB
79.7
31.07.2022
46
Strengthening from km 38.85 to 97.05 of NH-227A
56.75
64.97
21.03.2022
47
One time improvement of left out portion of ROB at km 12 of NH-103 and km 132 & 135 of NH-19 on item rate mode
4.95
3.95
27.09.2021
48
Widening and strengthening of existing road into 2 lane with paved shoulder from Pokhrauni Chowk to Junction with NH- 57 near Jhanjharpur (km 0.00 o 28.00) of NH-527A in the State of Bihar
26.3
98.84
30.09.2022
49
Strengthening and widening to 2 lane with paved shoulder from km 103.865 to
142.050 (Gaya-Goh) of NH-120
37.885
126.28
31.03.2022
50
Strengthening work in Km 38.84 to 59.00 Of NH-333 on EPC mode.
20.16
21.59
30.06.2021
51
Strengthening work in km 123.00 to
142.00 of NH-333A on EPC Mode
19
15.81
30.06.2021
52
Strengthening work in Km 75.25 to 91.00 of NH-333 on EPC Mode
15.75
21.9
31.03.2021
53
Strengthening of Road from km 91.00 to
115.00 of NH-333 on EPC mode
24
26.7
15.05.2021
54
Widening and strengthening from km
115.00 (Tola Kurwa) to 141.050 (Bishunpur) of NH-333
26.5
95.77
15.02.2022
55
Construction of RCC Minor bridge in km 02, km 14, km 40 and km 43 of NH-333
bridge
23.5
30.09.2022
56
Strengthening work from Km 0.00 (Paswan chowk) to 58.450
(Mushrigharari) of NH-103 on EPC Mode
55.5
64.3
30.04.2022
57
Reconstruction of damaged Bridge over river Tungi Bridge on NH-82 (H.L. RCC Bridge Km 38)
Bridge
19.3
19.08.2021
58
Strengthening including improvement of geometrics work from km 97 to km
104.20 of NH-28B (New NH-727 on EPC
mode
7.2
8.52
16.10.2020
59
Construction of 2-lane combined ROB in lieu of level crossing No-KK-12 of km 48 (Pranpur) of NH-81
1.48
48.5
21.09.2022
60
Construction of Major bridge over Bhangia River at km 86.936 of NH-327E & its approaches on EPC mode
0.34
14.01
30.01.2023
61
Widening to 2 lane with paved shoulder and strengthening from km 19.860 to
38.060 of NH-219 on EPC Mode
18.2
99.41
07.05.2022
62
Strengthening from Ch. 16.000 to 19.860 and Ch 38.060 to Ch 40.000 of NH-219 on EPC mode in the State of Bihar
5.8
19.6
01.08.2022
63
Strengthening work in Km 0.00 to 34.00 of NH-333A on EPC Mode.
34
27.58
30.11.2022
64
Rehabilitation of 4-lane 5.575 km long, 4- lane MG Setu over Ganga River on NH-
19 from km 212.72 to km 218.95 by dismantling the damaged pre stressed cantilever arms Superstructure and subsequent redecking by steel truss in Patna on EPC mode
5.575
1856.98
31.07.2022
65
Engineering, Procurement, and Construction of Rehabilitation and Upgrading to 2- lanes/2 – lane with Paved Shoulders Configuration and Strengthening of Fatuah-Harnaut-Barh Section (km 0 to km 69.6) of NH-30A in the State of Bihar under Phase-I of National Highways Inter-connectivity Improvement Projects (NHIIP)
71.8
812.6
31.05.2022
66
Widening & Strengthening to 2 lane with paved shoulder from Km 30.00 to 45.00 of NH-101 in the State of Bihar item rate
15
63.86
15.04.2022
67
Construction of 2-lane ROB in lieu of level crossing No-KK-4A of km 31 (Mania)of NH-81
ROB
47.95
20.01.2023
68
Widening & Strengthening from km
100.40 to km 107.80 (from Lakhanpur More to Faijullahpur) of NH-227A under EPC mode in the state of Bihar
7.4
22.69
30.05.2022
69
Strengthening & widening to 2 lane with paved shoulder from Km 0.00 to 14.50 of NH-101 for the year 2017-18 in the State of Bihar on item rate
13
53.09
15.12.2021
70
Construction of 03 Nos. New High Level RCC Minor Bridges (2*21.60m) in Km
62 (Chainage-61+247), (2*18.60m) in Km 62 (Chainage-61+650) & (2*18.60m) in Km 64 in Replacement of existing old Narrow and damaged Bridge of NH-110 on EPC mode in the State of Bihar
Bridge
15.42
31.03.2023
71
Strengthening & Widening from km 0.00 to 10.80 of NH-21
67.13
50.67
30.06.2022
72
Widening and strengthening from km
179.00 to 198.93 of NH-333A
52.4
40.28
31.03.2021
73
Construction of New High Level RCC major Bridge (13X31m)in place of old submersible damaged bridge in Km178 on NH-333A across River Chanan in the state of Bihar on EPC mode
0.503
42.94
24.11.2023
74
Construction of 2-lane ROB of km 46 (LC No KT2-2/B)of NH-131A (Katihar)
1.051
43.11
01.06.2023
75
Widening to 2 lane with paved shoulder and strengthening from km 45.00 to 65.00 (design length- 18.990) of NH-101 on EPC Mode
20
84.70
30.06.2022
76
Remaining work for Strengthening & Widening work of existing road into 2 lane with paved shoulder from Pokhrauni Chowk to Junction with NH 57 near Jhanjharpur (km 0.00 to 28.00) of NH – 527A in the State of Bihar.
0.57
25.1
31.12.2022
77
Strengthening and widening to 2 lane with paved shoulder from km 142.05 to 167 (Goh- Daudnagar) of NH-120
25.415
89.41
12.12.2022
78
Construction of road side covered drain in km 213 (P) to 215 (P) in Bihra Bazar of NH-327E on EPC Mode
0
4.24
17.09.2022
79
One time improvement of left out portion of NH-80 from km 119+885 (Dogachhi) to km 132+895 (Zero mile Bhagalpur) on EPC mode in the State of Bihar
13.01
12.03
06.10.2023
80
Widening to Two Lane with Paved shoulders including strengthening of existing pavement from km 0.00 to km 24.800 of NH-28B (New NH 727) on
EPC mode in the state of Bihar
24.8
74.83
22.09.2023
81
Widening to two lane with paved shoulders including strengthening of existing pavement from km 14.5 to km
30.00 of NH 101 (New NH 331) on EPC
mode in the state of Bihar
15.5
61.78
07.10.2023
82
Construction of 2-lane ROB of km 100 of NH-327E
1.8
62.26
31.12.2023
83
Construction of 4-lane ROB of km 12 of NH-103
2.11
123.23
31.03.2024
84
Construction of High level New RCC Bridge at km 81.00 of NH-327E on EPC Mode
0.48
10.93
31.05.2024
85
Construction of 2-lane ROB of km 132 of NH-19
2
77.38
26.08.2019
86
Balance work of construction of 3x 18m (eff. Span ) High level RCC Bridge across river Mani in Km 94 of NH-80 in the state of Bihar
0.41
7.73
05.03.2022
87
Construction of additional two lane with paved shoulder of NH-98 (New NH 139) from existing Ch 7.000 to Ch 17.840(Design Ch 0.000 to 10.840)
[AllMS (Bhusaula Golambar ) to Naubatpur (Patna Ring Road ) section] on EPC mode
10.84
56.8
31.05.2024
88
Strengthening and widening to 2 lane with paved shoulder from km 181.465 to 201.665 of NH-120 Nasriganj – Vikramganj
20.2
74.90
31.03.2024
89
Construction of High Level R.C.C Major Bridge at Km. 38 (Bandhuganj) on N.H.- 110 in the State of Bihar
Bridge
18.41
31.08.2024
90
Construction of 2-lane ROB of km 135 of NH-19 (L.C No 62-A/3-E)
ROB
50.0
15.09.2024
91
Simaria (Km. 206.050) to Khagaria (Km. 266.282)
60.23
567
30.03.2023
92
Construction of approaches to Rail cum Road bridge across river Ganga near Munger ghat
14.52
293.16
30.09.2022
93
Bhojpur Buxar section of NH-84 from km.27.37 to km. 75.00
47.9
681.67
16.05.2023
94
Bakhtiyarpur-Rajauli Pkg-II from km.
47.23
1065
27.04.2023
54.405 to km.101.630
95
Construction of 2nd flyover (LCW) in Kishanganj town starting from Km.472.300 to Km. 475.480 of NH-31
3.18
129.2
18.08.2023
96
Four lanning of Forbesganj to Jogbani section from Km. 0.000 to Km.9.258 (ICP jogbani) of NH-57A
9.26
247.36
31.07.2023
97
4L of Narenpur – Purnea Section of NH- 131A
49
1905
29.03.2024
98
4L of Galgalia – Bahadurganj section from Km 0.000 to Km 49.000 (Package-I) of NH327E
49
1051
06.04.2024
99
4 – lanning of Bahadurganj – Araria (Pkg-II)
45
1081.7
10.08.2024
100
2L with PS Piprakothi-Motihari-Raxaul NH-28A EPC
68.60
445.22
30.01.2024
101
4L Ara-Pararia section of NH – 319
54.53
700
31.01.2023
102
Kanhauli – Ramnagar of Patna Ring Road-pkg-I
39.16
797
31.05.2023
103
2l with paved shoulder of Chhapra- Gopalganj section of NH-85 from Km.0.000 to Km.93.500
94.258
644.27
09.07.2022
104
2L with PS Biharsharif – Barbigha – Mokama NH-82 (EPC)
54.76
297.27
28.02.2021
105
2LPS Chhapra – Rewaghat – Muzaffarpur section of NH – 722
73.07
427.06
17.01.2021
106
Forbesganj-Simrahi CII-BR-3 (Km. 230.00 – Km. 190.00)
34.87
357
30.06.2016
107
2L with PS Mokama – Munger NH-80 on BOT (Annuity)
60.48
351.5
13.10.2018
108
2L with PS Khagaria – Purnea NH-31 on BOT (Annuity)
140
664
30.04.2018
ANNEXURE-IV
ANNEXURE-IV REFERRED TO IN REPLY TO PART (e) OF LOK SABHA UNSTARRED QUESTION NO. 4022 TO BE ANSWERED ON 19.12.2024 ASKED BY SHRI TARIQ ANWAR REGARDING NATIONAL HIGHWAYS IN BIHAR
Details of toll plaza-wise number of toll tenders which have been extended beyond their original period
Name of Toll Plaza
No of Extension of Original Contract Period during previous one year (excluding contractual extension) w.e.f Jan 2023
Babhaniyawan
1st time for 44 days (Original Contract Period 21.07.2023 to 21.10.2023) (Extended upto 05.12.2023)
2nd time for 80 days (Original Contract Period 23.01.2024 to 24.04.2024) (Extended upto 14.07.2024)
Kharik
1st Time for 14 days
2nd Time for 23 days
Maranga
1 time for 33 days
Kulhariya
1 time for 13 days
Saidpur
1 time for 09 days
Karigawan
1st time from May/2023 to 13-04-24 and 2nd tme 14-04-24 to till now
(Toll started in May/2023)
Runni
1 Time – for overstay period from 24.09.2024 (08:00:00) till
05.10.2024 (07:59:59).
Maithi
1st Time – for EOT approved period in case of FMC due to Covid & Demonitization from 19.07.2024 (00:00:00 Hrs.) till 13.10.2024
(21:24:00 Hrs.).
Raje
Asanpur
Hariabara
Saukala
M/s Eagle Infra India Ltd. [Original Contract period from 21.03.2022
(08:00 Hrs) to 21.03.2024 (08:00 Hrs)]. Extended for one month from 21.03.2024 (08:00 Hrs.) to 20.04.2024 (08:00 Hrs.)
Phulwaria
one time for 30 days (Original contract period 26.08.2024 to
26.11.2024)
Bishunpurwa
one time for 15 days (Original contract period 11.07.2023 to
11.07.2024)
Bishunpurwa
one time for 90 days (Original contract period 11.04.2022 to
11.04.2023)
Thawe
one time for 3 days (Original contract period 19.06.2023 to
19.06.2024
Sonho
one time for 71 days (Original contract period 30.07.2023 to
30.07.2024)
Chainwa
one time for 119 days (Original contract period 05.04.2022 to
05.04.2023)
Pokhraira
one time for 120 days (Original contract period 22.07.2023 to
22.07.2024)
Balgudar
two times, (original contract period from 06.06.2022 to 10.06.2023, extended upto 24.10.2023) & (Original contract period from 16.04.2024 to 15.07.2024, extended up-to 15.10.2024)
Bhagalpur
one time for 4 days, (Original contract period from 27.08.2022 to
27.08.2023, extended up-to 01.09.2023)
This information was given by the The Union Minister of Road Transport & Highways, Shri Nitin Gadkari in a written reply in Lok Sabha today.