PRASAD and SDS Schemes
PRASAD and SDS Schemes
The Ministry of Tourism under the “Pilgrimage Rejuvenation and Spiritual, Heritage Augmentation Drive” (PRASHAD) provides financial assistance to the State Governments and Union Territory Administrations for development of tourism infrastructure at identified religious and heritage sites across the country. Since the launch of the Scheme, the Ministry of Tourism has sanctioned 54 projects in 28 States/UTs, the details of which are given in the Annexure-I.
The projects sanctioned under the said scheme are implemented by the State/UT Government concerned. The delay in the completion of projects under the PRASHAD scheme arise from various factors such as delays in the tendering process, limited capacity of the State Implementing Agency, untimely project planning and design, and non-submission of requisite documents.
However, the Ministry of Tourism regularly monitors the progress of project and also encourages respective State Government/ UT Administrations/ Central Agencies to complete the projects in a time bound manner.
The Ministry of Tourism under Swadesh Darshan scheme sanctioned 76 projects under identified thematic circuits for Rs.5290.30 Crore. Further, the Ministry revamped the scheme as Swadesh Darshan 2.0 (SD2.0) to develop sustainable and responsible tourism destinations and sanctioned 52 projects for Rs.2108.87 Crore. The details of these projects are given in the Annexure-II.
The selection of the tourism development projects under the schemes is done in synergy with scheme guidelines and in close consultation with the concerned State Governments/Union Territory Administrations, while taking into account the regional and cultural diversity of India.
Further, a holistic development approach is adopted in identification of destinations/ projects under the Swadesh Darshan 2.0 scheme, which includes future tourism potential, connectivity, alignment with sustainable and responsible tourism, etc.
Under the Swadesh Darshan scheme, the Ministry of Tourism has sanctioned 76 projects under different thematic circuits for Rs.5290.30 Crore across the country, including themes such as Rural, Himalayan, Tribal, Eco-tourism, Wildlife, Coastal, Northeast, etc.
The Ministry of Tourism had launched the Dekho Apna Desh initiative in January 2020 for promotion of domestic tourism in the country. Under this initiative, the Ministry promotes tourism destinations and products of India through various activities such as Webinars, Quiz, Pledge, Seminars, Tourism Promotional Events, Fam tours, Website, social media etc.
The Ministry of Tourism has put in place the Scheme of “Capacity Building for Service Providers” (CBSP) to provide education, training and certification to the tourism service providers including small tour operators, local artisans and homestay providers, to up-grade manpower at every strata of tourism industry in order to capitalize the vast tourism potential of the country to the fullest, and provide professional expertise to the local populace as well as create fresh opportunities in the tourism sector.
This information was given by Union Minister for Tourism and Culture Shri Gajendra Singh Shekhawat in a written reply in Lok Sabha today.
****
Sunil Kumar Tiwari
ANNEXURE-I
List of Projects sanctioned under PRASHAD Scheme
S.
no.
State
Project Name
Sanction Year
Approved Cost
(Rs. Crore)
Total Amount Released (Rs. Crore)
Status
Andhra Pradesh
Development of Amaravati Town, Guntur District as a Tourist Destination
2015-16
27.77
27.77
Completed.
Andhra Pradesh
Development of Srisailam Temple
2017-18
43.08
43.08
Completed
Andhra Pradesh
Sri Varaha Lakshmi Narsimha Swami VariDevasthanam at Simhachalam in Vishakhapatnam Temple
2022-23
54.04
27.37
Ongoing
Andhra Pradesh
Development of Pilgrimage Tourism Infrastructure in Annavaram Temple Town
2024-25
25.33
–
Ongoing
Arunachal Pradesh
Development of ParshuramKund, LohitDistt.
2020-21
37.88
31.02
Ongoing
Assam
Development of Kamakhya Temple and Pilgrimage Destination in and around Guwahati.
2015-16
29.80
29.80
Completed
Bihar
Development of basic facilities at Vishnupad temple, Gaya, Bihar
2014-15
3.63
3.63
Completed
Bihar
Development at Patna Sahib
2015-16
29.62
29.62
Completed
Bihar
Development of AamiMandir, Dist.- Saran
2024-25
13.29
–
Ongoing
Chhattisgarh
Development of MaaBamleshwari Devi Temple, Dongargarh, Rajnandgaon District, Chhattisgarh
2020-21
48.44
40.19
Physically Completed
Goa
Development of Bom Jesus Basilica
2024-25
16.46
4.68
Ongoing
Gujarat
Development of Dwarka
2016-17
10.46
10.46
Completed
Gujarat
Development of Pilgrimage Amenities at Somnath
2016-17
45.36
45.36
Completed
Gujarat
Development of Promenade at Somnath
2018-19
47.12
47.12
Completed
Gujarat
Development of Pilgrimage Facilities at Ambaji Temple, Banaskantha, Gujarat
2022-23
50
30
Ongoing
Haryana
Development of Mata Mansa and Nada SahebGurudwara Devi Temple in Panchkula District
2019-20
48.53
34.68
Ongoing
Jammu & Kashmir
Development at Hazratbal Shrine, Srinagar
2016-17
40.46
34.30
Physically Completed
Jharkhand
Development of Baba BaidyanathDham, Deoghar
2018-19
36.79
34.95
Physically Completed
Karnataka
Development of Pilgrimage Amenities at Sri Chamundeshwari Devi Temple, Mysuru
2023-24
45.38
–
Ongoing
Karnataka
Development of Sri RenukaYallamma Temple, Saundatti, Belagavi
2024-25
18.37
–
Ongoing
Karnataka
Development of Papnash Temple, Bidar District
2024-25
22.25
–
Ongoing
Kerala
Development at Guruvayur Temple
2016-17
45.19
45.19
Completed
Madhya Pradesh
Development of Omkareshwar
2017-18
43.93
43.93
Completed
Madhya Pradesh
Development of Amarkantak
2020-21
49.99
42.47
Physically Completed
Maharashtra
Development of Trimbakeshwar, Nashik
2017-18
45.41
38.44
Ongoing
Meghalaya
Development of Pilgrimage Facilitation in Meghalaya
2020-21
29.29
27.78
Physically Completed
Mizoram
Development of Infrastructure for Pilgrimage and Heritage Tourism in the State of Mizoram
2022-23
44.89
26.37
Ongoing
Mizoram
Development of Basic Amenities under PRASHAD scheme in Vangchhia, Champhai district
2024-25
5.47
–
Ongoing
Nagaland
Development of Pilgrimage Infrastructure in Nagaland
2018-19
25.20
23.56
Physically completed
Nagaland
Development of Pilgrimage Tourism Infrastructure at Zunheboto
2022-23
18.18
15.45
Ongoing
Odisha
Infrastructure Development at Puri, Shree JagannathDham– Ramachandi- Prachi River front at Deuli under Mega Circuit #
2014-15
50.00
10.00
Foreclosed
Punjab
Development of KarunaSagar Valmiki Sthal at Amritsar
2015-16
6.4
6.4
Completed
Punjab
Development of Chamkaur Sahib at Rupar, Punjab
2021-22
30.52
21.93
Ongoing
Rajasthan
Integrated Development of Pushkar/Ajmer
2015-16
32.64
26.11
Physically Completed
Puducherry
Development of Pilgrim Facilities & Tourist attractions for Sri Dharbaranyeswarar Temple & Spiritual Park at Thirunallar
2024-25
25.94
–
Ongoing
Sikkim
Development of Pilgrimage Facilitation at Four Patron Saints, Yuksom
2020-21
33.32
28.31
Physically Completed
Tamil Nadu
Development of Kanchipuram
2016-17
13.99
13.99
Completed
Tamil Nadu
Development of Velankanni
2016-17
4.86
4.86
Completed
Tamil Nadu
Development of Navagraha Temple Circuit (8 Temples)
2024-25
40.94
–
Ongoing
Telangana
Development of Jogulamba Devi Temple, Alampur
2020-21
38.9
33.07
Physically Completed
Telangana
Development of Pilgrimage and Heritage Tourism Infrastructure at Rudreshwara(Ramappa) Temple, Mulugu
2022-23
62
32.73
Ongoing
Telangana
Development of Pilgrimage Infrastructure at Bhadrachalam, Bhadradri, Kothagudem District
2022-23
41.38
8.43
Ongoing
Telangana
Development at Goddess RenukaYellammaDevasthanam, Balkampet, Hyderabad
2024-25
4.22
–
Ongoing
Tripura
Development of Tripura Sundari Temple, Udaipur
2020-21
34.43
28.01
Ongoing
Uttar Pradesh
Construction of Tourist Facilitation Centre at Vrindavan
2014-15
9.36
9.36
Completed
Uttar Pradesh
Development of Mathura-Vrindavan as Mega Tourist Circuit (Ph-II)
2014-15
10.98
10.98
Completed
Uttar Pradesh
Development of Varanasi –Phase –I
2015-16
18.73
18.73
Completed
Uttar Pradesh
Development of Varanasi – Phase II
2017-18
44.6
31.77
Physically Completed.
Uttar Pradesh
River Cruise Tourism in Ganga, Varanasi
2017-18
9.02
9.02
Completed
Uttar Pradesh
Development of Infrastructure facilities at Govardhan
2018-19
37.59
30.97
Physically Completed
Uttarakhand
Integrated Development of Kedarnath
2015-16
34.77
34.77
Completed
Uttarakhand
Development of Infrastructure for Pilgrimage Facilitation in Badrinath Ji Dham
2018-19
56.15
38.38
Ongoing
Uttarakhand
Augmentation of Pilgrimage Infrastructure Facilities and Gangotri and Yamunotri Dham
2021-22
54.36
10.22
Foreclosed (Physically Completed)
West Bengal
Development of Belur Math
2016-17
30.03
23.39
Physically Completed
ANNEXURE-II
List of Projects under Swadesh Darshan Scheme
S.
No.
State/UT
Circuit/ Sanction Year
Name of the Project
Amount Sanctioned (Rs. Crore)
Andaman & Nicobar Islands
Coastal Circuit
2016-17
Development of Long Island-Ross Smith Island- Neil Island- Havelock Island- Baratang Island-Port Blair
27.57
Andhra Pradesh
Coastal Circuit
2014-15
Development of Kakinada – Hope Island – Coringa Wildlife Sanctuary – Passarlapudi – Aduru – S Yanam – Kotipally
67.83
Andhra Pradesh
Coastal Circuit
2015-16
Development of Nellore – Pulikat Lake – Ubblamadugu Water Falls – Nelapattu- Kothakoduru- Mypadu – Ramateertham – Iskapalli
49.55
Andhra Pradesh
Buddhist Circuit
2017-18
Development of Buddhist Circuit: Shalihundam- Bavikonda- Bojjanakonda -Amravati- Anupu
35.24
Arunachal Pradesh
North-East Circuit
2014-15
Development of Bhalukpong- Bomdila and Tawang
49.77
Arunachal Pradesh
North East Circuit
2015-16
Development of Nafra- Seppa- Pappu, Pasa, Pakke Valleys- Sangdupota- New Sagalee- Ziro- Yomcha
96.72
Assam
Wildlife Circuit
2015-16
Development of Manas– Probitora– Nameri– Kaziranga– Dibru– Saikhowa
94.68
Assam
Heritage Circuit
2016-17
Development of Tezpur – Majuli – Sibsagar
90.98
Bihar
Tirthankar Circuit
2016-17
Development of Vaishali- Arrah- Masad- Patna- Rajgir- Pawapuri- Champapuri
33.96
Bihar
Spiritual Circuit
2016-17
Development of Kanwaria Route: Sultanganj – Dharmshala- Deoghar
44.76
Bihar
Buddhist Circuit
2016-17
Development of Buddhist circuit- Construction of Convention Centre at Bodhgaya
95.18
Bihar
Rural Circuit
2017-18
Development of Bhitiharwa- Chandrahia- Turkaulia
44.27
Bihar
Spiritual Circuit
2017-18
Development of Mandar Hill &Ang Pradesh
44.55
Chhattisgarh
Tribal Circuit
2015-16
Development of Jashpur- Kunkuri- Mainpat- Kamleshpur – Maheshpur -Kurdar – Sarodhadadar- Gangrel- Kondagaon– Nathiyanawagaon- Jagdalpur- Chitrakoot- Tirthgarh
96.10
Goa
Coastal Circuit
2016-17
Development of Sinquerim-Baga, Anjuna-Vagator, Morjim-Keri, Aguada Fort and Aguada Jail
97.65
Goa
Coastal Circuit
2017-18
Development of Coastal Circuit II: Rua De Orum Creek – Dona Paula -Colva – Benaulim
99.35
Gujarat
Heritage Circuit
2016-17
Development of Ahmedabad- Rajkot- Porbandar –Bardoli- Dandi
59.17
Gujarat
Heritage Circuit
2016-17
Development of Vadnagar- Modhera
91.12
Gujarat
Buddhist Circuit
2017-18
Development of Junagadh- GirSomnath- Bharuch-Kutch- Bhavnagar- Rajkot- Mehsana
26.68
Haryana
Krishna Circuit
2016-17
Development of Tourism Infrastructures at places related to Mahabharata in Kurukshetra
77.39
Himachal Pradesh
Himalayan Circuit
2016-17
Development of Himalayan Circuit: Kiarighat, Shimla, Hatkoti, Manali, Kangra, Dharamshala, Bir, Palampur, Chamba
68.34
Jammu & Kashmir
Himalayan Circuit
2016-17
Development of Jammu-Srinagar-Pahalgam-Bhagwati Nagar-Anantnag-Salamabad Uri-Kargil-Leh
77.33
Jammu & Kashmir
Himalayan Circuit
2016-17
Development of Tourist Facilities at Jammu-Rajouri-Shopian-Pulwama.
81.60
Jammu & Kashmir
Himalayan Circuit
2016-17
Development of Tourist Facilities – Construction of Assets in lieu of those Destroyed in Floods in 2014 under PM Development Package
90.43
Jammu & Kashmir
Himalayan Circuit
2016-17
Development of Tourist facilities at Mantalai and Sudhmahadev
91.99
Jammu & Kashmir
Himalayan Circuit
2016-17
Development of Tourist facilities at Anantnag-Pulwama-Kishtwar-Pahalgam-ZanskarPadum – Daksum – RanjitSagar Dam
86.39
Jammu & Kashmir
Himalayan Circuit
2016-17
Development of Tourist Facilities at Gulmarg-Baramulla- Kupwara- Kargil – Leh
91.84
Jharkhand
Eco Circuit
2018-19
Development of Eco Tourism circuit: Dalma- Betla National park- Mirchaiya- Netarhat
30.44
Kerala
Eco Circuit
2015-16
Development of Pathanamthitta- Gavi- Vagamon- Thekkady
64.08
Kerala
Spiritual Circuit
2016-17
Development of Sabarimala – Erumeli-Pampa-Sannidhanam
46.54
Kerala
Spiritual Circuit
2016-17
Development of SreePadmanabhaArnamula
78.08
Kerala
Rural Circuit
2018-19
Development of Malanad Malabar Cruise Tourism Project
57.35
Kerala
Spiritual Circuit
2018-19
Development SivagiriSree Narayana Guru Ashram- Arruvipuram- KunnumparaSreeSubrahmania- ChembazhanthiSree Narayana Gurukulam
66.42
Madhya Pradesh
Wildlife Circuit
2015-16
Development of Wildlife Circuit at Panna- Mukundpur- Sanjay- Dubri-Bandhavgarh- Kanha- Mukki- Pench
92.10
Madhya Pradesh
Buddhist Circuit
2016-17
Development of Sanchi-Satna-Rewa-Mandsaur-Dhar
74.02
Madhya Pradesh
Heritage Circuit
2016-17
Development of Gwalior – Orchha – Khajuraho – Chanderi – Bhimbetka – Mandu
89.82
Madhya Pradesh
Eco Circuit
2017-18
Development of Gandhisagar Dam- Mandleshwar Dam- Omkareshwar Dam- Indira Sagar Dam- Tawa Dam- Bargi Dam- BhedaGhat- Bansagar Dam- Ken River
93.76
Maharashtra
Coastal Circuit
2015-16
Development of Sindhudurg Coastal Circuit – Sagareshwar, Tarkarli, Vijaydurg (Beach & Creek), Mitbhav
19.06
Maharashtra
Spiritual Circuit
2018-19
Development of Waki- Adasa- Dhapewada- Paradsingha- Telankhandi- Girad
45.47
Manipur
North-East Circuit
2015-16
Development of Tourist Circuit in Manipur: Imphal- Khongjom
72.23
Manipur
NSpiritual Circuit
2016-17
Development of Shri Govindajee Temple, Shri BijoyGovindajee Temple – Shri Gopinath Temple – Shri Bungshibodon Temple – Shri Kaina Temple
45.34
Meghalaya
North East Circuit
2016-17
Development of Umium (Lake View), U LumSohpetbneng-Mawdiangdiang – Orchid Lake Resort
99.13
Meghalaya
North East Circuit
2018-19
Development of West Khasi Hills (Nongkhlaw- KremTirot – Khudoi&Kohmang Falls – Khri River- Mawthadraishan, Shillong), Jaintia Hills (Krang Suri Falls- Shyrmang- Iooksi), Garo Hills (Nokrek Reserve, KattaBeel, Siju Caves)
84.97
Mizoram
North East Circuit
2015-16
Development of Thenzawl& South Zote, District Serchhip and Reiek.
92.26
Mizoram
Eco Circuit
2016-17
Development of Eco-Adventure Circuit Aizawl -Rawpuichhip – Khawhphawp – Lengpui – Chatlang- Sakawrhmuituaitlang – Muthee – Beratlawng -Tuirial Airfield – Hmuifang
66.37
Nagaland
Tribal Circuit
2015-16
Development of Tribal Circuit Peren- Kohima- Wokha
97.36
Nagaland
Tribal Circuit
2016-17
Development of Mokokchung-Tuensang-Mon
98.14
Odisha
Coastal Circuit
2016-17
Development of Gopalpur, Barkul, Satapada and Tampara
70.82
Puducherry
Coastal Circuit
2015-16
Development of Dubrayapet – Arikamedu – Veerampattinam – Chunnambar – Nallavadu/Narambai – Manapet- Kalapet – Puducherry – Yanam
58.44
Puducherry
Heritage Circuit
2017-18
Development of Franco- Tamil Village, Karaikal, Mahe and Yanam
49.44
Puducherry
Spiritual Circuit
2017-18
Development of Spiritual Circuit in Puducherry
34.96
Punjab
Heritage
Circuit
2018-19
Development of Anandpur Sahib – Fatehgarh Sahib – Chamkaur Sahib – Ferozpur – Khatkar Kalan – Kalanour – Patiala
85.32
Rajasthan
Desert
Circuit
2015-16
Development of Sambhar Lake Town and Other Destinations
50.01
Rajasthan
Krishna
Circuit
2016-17
Development of Govind Dev ji temple (Jaipur), KhatuShyam Ji (Sikar) and Nathdwara (Rajsamand)
75.80
Rajasthan
Spiritual Circuit
2016-17
Development of Spiritual Circuit– ‘Development of Churu (SalasarBalaji)-Jaipur (Shri SamodkeBalaji, GhatkeBalaji, BandhekeBalaji)- Viratnagar (Bijak, Jainnasiya, Ambika Temple)- Bharatpur (Kaman Region)- Dholpur (Muchkund) – MehndipurBalaji- Chittorgarh (Sanwaliyaji)
87.05
Rajasthan
Heritage
Circuit
2017-18
Development of Heritage Circuit Development of Rajsamand (Kumbhalgarh Fort) – Jaipur (Facade Illumination in Jaipur and Nahargarh Fort) -Jhalawar (Gagron Fort) – Chittorgarh (Chittorgarh Fort) – Jaisalmer (Jaisalmer Fort) – Hanumangarh (Gogamedi) – Udaipur (Pratap Gaurav Kendra) – Dholpur (Bagh-I-Nilofor and PuraniChawani) – Nagaur (Meera Bai Smarak, Merta) – Tonk (SunehriKothi)
70.61
Sikkim
North
East
Circuit
2015-16
Development of Tourist Circuit linking Rangpo (entry) – Rorathang- Aritar- Phadamchen- Nathang-Sherathang- Tsongmo- Gangtok-Phodong- Mangan- Lachung-Yumthang- Lachen- Thangu-Gurudongmer- Mangan- Gangtok-TuminLingee- Singtam (exit)
98.05
Sikkim
North East Circuit
2016-17
Development of Tourist Circuit Linking Singtam– Maka- Temi-BermoikTokel- Phongia- Namchi –Jorthang- Okharey- Sombaria-Daramdin- Jorethang- Melli (Exit)
95.32
Tamil Nadu
Coastal Circuit
2016-17
Development of (Chennai- Mamamallapuram – Rameshwaram – Manpadu – Kanyakumari)
73.13
Telangana
Eco Circuit
2015-16
Development of Eco Tourism Circuit in Mahaboobnagar district
91.62
Telangana
Tribal Circuit
2016-17
Development of Mulugu-Laknavaram- Medavaram- Tadvai- Damaravi- Mallur- Bogatha Waterfalls
79.87
Telangana
Heritage Circuit
2017-18
Development of QutubShahi Heritage Park- Paigah Tombs- Hayat Bakshi Mosque- Raymond’s Tomb
96.90
Tripura
North East Circuit
2015-16
Development of Agartala – Sipahijala – Melaghar – Udaipur – Amarpur- Tirthamukh- Mandirghat– Dumboor- NarikelKunja- Gandachara– Ambassa
82.85
Tripura
North
East Circuit
2018-19
Development of SurmaCherra- Unakoti- Jampui Hills- Gunabati – Bhunaneshwari- Neermahal- Boxanagar- Chottakhola- Pilak- Avangchaarra
44.83
Uttar Pradesh
Buddhist Circuit
2016-17
Development of Srawasti, Kushinagar, &Kapilwastu
87.89
Uttar Pradesh
Ramayana Circuit
2016-17
Development of Chitrakoot and Shringverpur
69.45
Uttar Pradesh
Spiritual Circuit
2016-17
Development of Ahar-Aligarh-Kasganj-Sarosi (Unnao)-Pratapgarh- Kausambi-Mirzapur-Gorakhpur-Domariyaganj-Basti-Barabanki-Azamgarh-Kairana- Baghpat- Shahjahanpur
71.91
Uttar Pradesh
Spiritual Circuit
2016-17
Development of Bijnor- Meerut- Kanpur- Kanpur Dehat- Banda- Ghazipur- Salempur- Ghosi- Balia- Ambedkar Nagar- Aligarh- Fatehpur- Deoria- Mahoba- Sonbhadra- Chandauli- Mishrikh- Bhadohi
67.51
Uttar Pradesh
Heritage Circuit
2016-17
Development of Kalinjar Fort (Banda)- MagharDham (SantKabir Nagar)- ChauriChaura, Shaheed Sthal (Fatehpur)- MahuarshaheedSthal (Ghosi)- Shaheed Smarak (Meerut)
36.65
Uttar Pradesh
Ramayana Circuit
2017-18
Development of Ayodhya
127.21
Uttar Pradesh
Spiritual Circuit
2018-19
Development of Jewar-Dadri-Sikandrabad-Noida-Khurja-Banda
12.03
Uttar Pradesh
Spiritual Circuit
2018-19
Development of Gorakhnath Temple (Gorakhpur), Devipattan Temple (Balrampur) and Vatvashni Temple (Domariyagunj)
18.30
Uttarakhand
Eco Circuit
2015-16
Integrated Development of Eco-Tourism, Adventure Sports, and Associated Tourism Related Infrastructure for Development of Tehri Lake & Surroundings as New Destination-District Tehri
69.17
Uttarakhand
Heritage Circuit
2016-17
Integrated Development of Heritage Circuit in Kumaon Region – Katarmal -Jogeshwar-Baijnath-Devidhura
76.32
West Bengal
Coastal Circuit
2015-16
Development of Beach Circuit: Udaipur- Digha- Shankarpur- Tajpur- Mandarmani- Fraserganj-Bakkhlai- Henry Island
67.99
–
Wayside Amenities
2018-19
Development of Wayside Amenities in Uttar Pradesh and Bihar at Varanasi-Gaya; Kushinagar-Gaya- Kushinagar in collaboration with MoRTH
17.50
Total
5290.33
List of projects under Swadesh Darshan 2.0 scheme
S No
State
Year of Sanction
Destination
Name of the Experience
Sanctioned Cost
(Rs. Crore)
Amount Authorised (Rs. Crore)
1
Andhra Pradesh
2024-25
Bapatala
Development of Suryalanka Beach Experience
97.52
9.75
2
Andhra Pradesh
2023-24
Araku-Lambasingi
Borra Cave Experience at Araku
29.87
2.99
3
Arunachal Pradesh
2023-24
Nacho
Unlock Nacho Expedition
14.02
1.40
4
Arunachal Pradesh
2023-24
Mechuka
Mechuka Cultural Haat
18.48
1.85
5
Arunachal Pradesh
2023-24
Mechuka
Mechuka Adventure Park
12.75
1.28
6
Assam
2023-24
Kokrajhar
Kokrajhar Wetland Experience
26.67
2.66
7
Assam
2023-24
Jorhat
Reimagining Cinnamara Tea Estate
23.88
2.38
8
Bihar
2024-25
Bodh Gaya
Development of the Buddhist Meditation & Experience Centre, Bodh Gaya
165.44
16.54
9
Chhattisgarh
2024-25
Kawardha
Bhoramdeo Corridor Development, Kabirdham District
145.99
14.59
10
Dadra Nagar & Haveli and Daman & Diu
2024-25
Daman
Daman Convention Centre
147.13
CRZ clearance required
11
Goa
2023-24
Porvorim
Porvorim Creek Experience
24.07
2.40
12
Goa
2023-24
Colva
Colva Beach Experience
19.98
1.99
13
Haryana
2024-25
Panchkula
Development of Adventure Tourism Hub at TikkarTaal and Adventure Park
26.68
2.68
14
Haryana
2024-25
Panchkula
Rejuvenation of Yadavindra Garden
65.82
6.58
15
Himachal Pradesh*
2024-25
MaaChintpurni Temple (District – Una)
Development of MaaChintpurni Devi Temple, Una
56.26
5.62
16
Karnataka
2023-24
Hampi
Setting up of ‘Traveller nooks’
25.63
2.56
17
Karnataka
2023-24
Mysuru
Tonga ride Heritage experience zone
2.71
0.27
18
Karnataka
2023-24
Mysuru
Ecological Experience Zone
18.48
1.84
19
Kerala
2023-24
Kumarakom
Kumarakom Bird Sanctuary Experience
13.92
1.39
20
Kerala
2024-25
Alappuzha
Alappuzha: A Global Water Wonderland
93.17
9.31
21
Kerala
2024-25
Malampuzha
Enhancement of Tourist Experience at Malampuzha Garden and Leisure Park
75.87
7.58
22
Ladakh
2023-24
Leh
JulleyLeh Biodiversity Park
23.16
2.31
23
Ladakh
2023-24
Kargil
Exploring LOC and Hundarman village Experience
11.91
1.19
24
Lakshadweep
2024-25
Bangaram
Enhancement of Tourist Experience at Bangaram
81.18
8.11
25
Madhya Pradesh
2023-24
Gwalior
Phoolbagh Experience Zone
16.73
1.67
26
Madhya Pradesh
2023-24
Chitrakoot
Spiritual experience at Chitrakoot
27.21
2.72
27
Madhya Pradesh*
2024-25
PitambaraPeeth, Datia
Development of PitambaraPeethDatia
44.24
Under process
28
Maharashtra
2023-24
Pune
Shivsrushti Historical Theme Park- Phase 3
76.22
7.62
29
Meghalaya
2023-24
Sohra
Waterfall Trails Experience
27.84
Under process
30
Meghalaya
2023-24
Sohra
Meghalayan Age Cave Experience
32.45
3.24
31
Mizoram
2024-25
Champhai
Eco Resort Experience at Keilungliah, Zote, Ngur&Mualbuhvum, Champhai
38.85
3.88
32
Mizoram
2024-25
Champhai
Heritage and Cultural Centre, Champhai
33.87
3.38
33
Nagaland
2023-24
Chumoukedima
Eco-Tourism Exp at Chumoukedima viewpoint
7.87
0.78
34
Nagaland
2023-24
Chumuoukedima
Tribal Cultural Experience at Midway Retreat
21.56
2.15
35
Nagaland
2024-25
Chumuoukedima
Adventure Tourism Experience at Jacob Village, Chumoukediema
32.54
3.25
36
Puducherry
2023-24
Karaikal
Karaikal beach and waterfront experience
20.29
CRZ clearance required
37
Punjab
2023-24
Kapurthala
Eco Tourism experience at Kanjli wetland
20.06
Forest clearance required
38
Punjab
2023-24
Amritsar
Border Tourism Experience at Attari
25.90
2.59
39
Rajasthan
2023-24
Bundi
Spiritual Experience, Keshavraipatan
21.65
2.65
40
Rajasthan
2024-25
Sikar
Development works at Shri KhatuShyam Ji Temple (Sikar)
87.87
Under process
41
Rajasthan*
2024-25
Karni Mata temple, Bikaner dist.
Development Works at Shri Karnimatamandir, Bikaner
22.57
Under process
42
Rajasthan*
2024-25
MalaseriDungari (District – Bhilwara)
Development of MalaseriDungri, Bhilwara District
48.73
Under process
43
Sikkim
2023-24
Gyalshing
Eco-Wellness Experience at Yuksom Cluster
15.40
1.54
44
Sikkim
2023-24
Gangtok
Gangtok Cultural Village
22.59
2.25
45
Tamil Nadu
2023-24
Mamallapuram
Immersive experience at Shore Temple
30.02
NMA Clearance Required
46
Telangana
2023-24
Bhongir
Bhongir Fort Experiential Zone
56.81
5.68
47
Telangana
2023-24
Ananathagiri
Eco tourism zone at Ananathgiri forest
38.00
3.80
48
Tripura
2024-25
Agartala
Tripura Heritage Village &Sangeet Experience at Agartala (Phase-1 &2)
48.94
4.89
49
Uttar Pradesh
2023-24
Prayagraj
Azad Park and DekhoPrayagraj Trail Exp
14.52
1.45
50
Uttar Pradesh
2023-24
Naimisaranya
Vedic- wellness Experience
17.80
1.78
51
Uttarakhand
2023-24
Pithoragarh
Rural Tourism Cluster Experience at Gunji
17.86
1.78
52
Uttarakhand
2023-24
Champawat
Tea Garden Experience
19.89
1.98
TOTAL
2108.87