12,146 public EV charging stations operational across the country
12,146 public EV charging stations operational across the country
The Ministry of Heavy Industries (MHI) has been making consistent efforts for facilitating the promotion of electric vehicles in India. The FAME-II scheme inter-alia included financial support in the form of subsidy for setting up of Public Charging Infrastructure to instill confidence among the EV users.
Further, Ministry of Power has taken several initiatives to accelerate deployment of public Electric Vehicle (EV) charging infrastructure in the country. Details of the initiatives are as follows:
1. Guidelines & Standards for Charging Infrastructure for Electric vehicles issued in January, 2022 which has been amended on November, 2022 and April, 2023. The broad features of the above guidelines are as below:
2. Green Energy Open Access Rules,2022 has been notified with the objective to further accelerate renewable energy adoption, ensuring access to affordable, reliable, sustainable and green energy for all.
3. Ministry of Power also Launched “GO ELECTRIC” Campaign in February, 2021, to create awareness on the benefits of Electric Vehicles (EV), EV Charging Infrastructure and electric cooking in India.
The details of charging stations commissioned under FAME India Scheme Phase-II, State-wise, as on 02.02.2024, are annexed as ANNEXURE-I.
As per the information received from Ministry of Power, 12,146 nos. of public EV charging stations are operational across the country, as on 02.02.2024. The details of state wise operational public EV charging stations are at ANNEXURE-II.
As per the information received from NITI Aayog, charging infrastructure requirement depends upon the composition of Electric Vehicles, Running Patterns, Terrain & Geography, Urbanisation Pattern and the Technology of EVs and Charging Equipments. Since, all these factors are still evolving, there is no global consensus on number of charging points required for a certain number of EVs. The requirement is considered dynamic and in the wide range of 1 Charging Point per 20 EVs to 1 Charging Point per 150 EVs, depending upon aforementioned factors.
ANNEXURE-I
The details of charging stations commissioned under FAME India Scheme Phase-II, State-wise, as on 02.02.2024
Sr. No.
State / Union Territory
No. of EV Charging Station
1
Delhi
21
2
Gujarat
53
3
Haryana
2
4
Karnataka
1
5
Kerala
30
6
Maharashtra
13
7
Meghalaya
1
8
Tamil Nadu
13
9
Uttar Pradesh
11
10
West Bengal
3
Total
148
ANNEXURE-II
State wise operational public EV charging stations as on 02.02.2024
S. No.
State Name
No. of Operational PCS
1
Andaman & Nicobar
3
2
Andhra Pradesh
327
3
Arunachal Pradesh
9
4
Assam
86
5
Bihar
124
6
Chandigarh
12
7
Chhattisgarh
149
8
D&D and DNH
1
9
Delhi
1886
10
Goa
113
11
Gujarat
476
12
Haryana
377
13
Himachal Pradesh
44
14
Jammu & Kashmir
47
15
Jharkhand
135
16
Karnataka
1041
17
Kerala
852
18
Lakshadweep
1
19
Madhya Pradesh
341
20
Maharashtra
3079
21
Manipur
17
22
Meghalaya
21
23
Nagaland
6
24
Odisha
198
25
Pondicherry
23
26
Punjab
158
27
Rajasthan
500
28
Sikkim
2
29
Tamil Nadu
643
30
Telangana
481
31
Tripura
18
32
Uttar Pradesh
582
33
Uttarakhand
76
34
West Bengal
318
Total PCS
12,146
This information was given by the Minister of State for Heavy Industries, Shri Krishan Pal Gurjar, in a written reply in Lok Sabha today.
- Enabling owners of Electric Vehicles to charge their EVs at their residence/offices using their existing electricity connections.
- Prescribing Revenue sharing model for provision of land at promotional rates for public charging stations.
- Providing electricity connection to Public Charging Station (PCS) within stipulated timelines.
- Prescribing single part EV tariff for public charging stations and shall not exceed Average Cost of Supply (ACoS) till 31.03.2025.
- Specifies a ceiling of Rs 2.50 per unit and Rs 3.50 per unit of electricity used for slow AC charging of EVs at PCS during the solar and non-solar hours respectively. Additionally, a ceiling limit of Rs. 10/- per unit and Rs. 12/- per unit of electricity used for DC Fast charging of EVs at PCS during the solar and non-solar hours respectively has also been specified.
- Average cost of supply (ACoS) by DISCOMs to Public Charging Stations (PCSs) during solar hours shall have a rebate of 20% and a surcharge of 20% during all other times.